Site first, load second, equipment last

We order our questions deliberately. The sequence is not a selling method; it is the only way we know to produce advice that still holds up after the conversation has ended.

Two buildings with roofs of the same size, the same pitch and the same solar exposure can require different systems. One may carry a daytime load that absorbs its own generation; another may be unoccupied during the hours when generation peaks, with a connection that accepts little export. A third may be structurally sound today but due for a roof replacement that changes what can be fixed to it. Demand, building fabric and the connection determine the answer, and plant follows from those three inputs.

Before anything is described as a solar array, a battery or an efficiency upgrade, the assessment establishes what the site consumes, when it consumes it, how the building is constructed and what the connection allows. Missing information is recorded as a gap, together with the conclusions that gap restricts. A recommendation built on an assumed load is provisional, and the scope says so.

Four questions before equipment

Each item below is a line of enquiry. Any one of them can change the shape of a project, including the finding that no project is appropriate at this site. They are asked in this order because a later answer depends on an earlier one.

QuestionWhat is examinedWhat it can change
Load before plantInterval electricity data showing demand by time of day, not only an annual total.Whether generation is used on site, and whether storage has a duty. Two sites with identical annual consumption can call for different measures if one draws steadily overnight and the other peaks at 15:00.
Fabric before arraysRoof age, condition, orientation, shading, penetrations and remaining membrane warranty.Usable area and the sequence of work. A surface that will not outlast the equipment fixed to it requires renewal first, or the array is staged until that work is complete.
Connection before exportSwitchboard capacity, available space for protection and metering, and the network's written export limit.The practical ceiling on system size. The network document governs; an estimate taken from a drawing does not.
Operation before ownershipOccupancy, shift patterns, shutdown periods, tenancy arrangements and maintenance access.Where equipment can sit and how it is reached. A combiner board that cannot be reached without moving stock is relocated on the drawing, not at installation.
Information requested at the first conversation

The question being asked, the site address and type, twelve months of bills, interval data where the meter provides it, a site plan, roof information and the connection agreement. Savings percentages, rebate amounts and approval outcomes are not offered before those inputs exist.

ReviewInterval data, roof information and connection terms are assessed together at the Moorebank office before a design direction is set.

The assessment sequence

The steps below describe an assessment. They concern decisions and evidence, and are distinct from the delivery stages on the How We Work page. An assessment can stop at any step; the delivery process begins only once a client has a scope to approve.

01

State the question

The starting point is written down: a bill that has risen, a demand peak, a continuity requirement, a roof reaching the end of its life, or a planned expansion. A specific question produces a testable answer, and framing it often shows that the stated problem follows from a different cause.

02

Assemble the evidence

Interval data, recent bills, a site plan, roof information and connection details are gathered where they exist. Missing items are logged as gaps and the affected conclusions are named. An absent connection agreement is recorded as a gap with a stated consequence.

03

Test the constraints

Structural condition, membrane warranties, switchboard space, export limits, tenancy arrangements and future access are examined. From this point they are design inputs rather than obstacles discovered during installation.

04

Form the options

More than one route is set out where more than one is credible, including doing nothing yet. Each option states what it achieves, what it requires and what it rules out.

05

Stage the recommendation

Where the case is strong but an input is uncertain, a sequence is recommended instead of a single commitment. A first step is built and measured, and its operating records inform the second.

06

Record and reopen

The recommendation is written with its assumptions attached and its decision points marked. If an assumption proves wrong, the scope returns to the point where that assumption was used. The file then holds the original input, the new fact and the revised reasoning.

Measurements and assumptions are labelled separately

A measured interval reading is recorded as a measurement. A roof life estimate, an expected operating pattern or an assumed tariff is recorded as an assumption. The enquiry file keeps four categories apart: what was measured at the site, what the client supplied, what was assumed in the absence of data, and what was recommended on that basis.

Roof condition, tariff structure, operating hours, export limits and the intended duty of any storage appear in the file as inputs. A client can read which inputs a recommendation depends on. When an input changes, the earlier conclusion is read against the new fact and the revision is recorded, rather than replaced without explanation.

Advice is a separable service

Assessment can be commissioned on its own. A client may want an independent reading before approaching anyone for equipment, or a second view on a proposal already in hand. Because the assessment is not tied to a product, it can conclude that solar should not be the first step, that a battery would have no duty to perform, or that demand reduction deserves the first allocation of capital.

Storage illustrates the distinction. A battery is not added by default alongside a solar array. It requires a stated duty: shifting energy between periods, reducing a demand peak, or holding a supply for an interruption. Each duty implies a different size, control strategy and set of compromises. A system reserved for backup cannot also cycle its capacity every day. Where the load data shows no duty, storage is left out and the question is revisited when the site or the tariff changes.

Staging, and what is not promised

A strong case with an uncertain site is a common combination. The load may justify a particular array while the roof, the connection or an upcoming tenancy change makes the timing unclear. In that situation a sequence is recommended: a first step that can be built and measured, and a second decided in the light of what the first actually did. Staging keeps the initial commitment proportionate to what is known.

No savings percentage is offered before a roof has been inspected and a tariff has been read. No rebate amount, approval outcome or completion date is given before a scope exists. No count of completed projects is claimed beyond the examples published here, and no client is named. Where a figure is needed, the inputs it depends on and the conditions under which it would change are stated instead.

Uncertainty and decision gates

Provisional inputs are marked as provisional, a measured fact is distinguished from an assumption, and a range stays as a range rather than being reduced to a single figure. Where a decision depends on information not yet available, a gate is defined: a point at which the client can stop, continue or change direction with the facts then known. Gates are placed before commitment.

The Moorebank office is the single point of contact throughout. The person who gathers the data prepares the options and answers a question weeks later, from the same file. A boundary stated at the outset is the boundary applied at handover.

Questions worth putting to any adviser

These are the challenges expected for our own work. They test evidence rather than presentation, and they apply to any adviser on a commercial energy project.

  • Show me the interval data you used. Ask to see the profile, not only the conclusion drawn from it. A recommendation should be traceable to demand by time of day.
  • Which constraint decided the size? Whether it was the roof, the switchboard or the export limit, a named constraint identifies what would change the answer.
  • What is excluded? A scope listing only inclusions is incomplete. Ask what the adviser is not responsible for and who holds that responsibility.
  • What would make you stop? A stopping condition should be named before work starts, not after a problem appears.
  • How will I know it worked? Ask what will be measured after installation and where those records will be kept.

The written record exists so these questions can be asked at any point in the engagement, including after handover. Where evidence is thin the advice states its limits; where it is strong the advice is specific about size, sequence and exclusions.

Questions about the assessment method

What data is needed to begin an assessment?

Twelve months of electricity bills and interval readings from the meter, at half-hourly or finer resolution where available. Alongside those: the current tariff schedule including any demand charge, a site plan, roof age and surface type with any remaining warranty, structural drawings or the name of the party able to confirm load capacity, a single-line diagram with switchboard condition and spare capacity, the network connection agreement and export conditions, and the site's occupied hours and shutdown periods. Where an item does not exist, it is logged as a gap and the conclusions it restricts are named.

Why is load examined before equipment?

System size follows demand by time of day. An annual total cannot show whether generation lands when the premises can absorb it, or whether a peak recurs often enough to give storage a duty. Sizing against a roof area or a catalogue instead of the load profile produces capacity the site cannot use, and the export limit may curtail part of it in any case. Establishing the load first also shows when demand reduction would make a smaller system sufficient.

When is storage excluded from a recommendation?

When interval data shows no duty: a steady load, no repeatable peak that the tariff charges for, and no continuity requirement worth reserving capacity for. Storage is also excluded where the site cannot accommodate the equipment safely, where connection conditions prevent the intended charging or discharging behaviour, or where the same capital would remove the peak through an operating change or an inefficient load. The assessment records what would have to change for storage to become sensible.

How are assumptions recorded?

Each input is labelled by origin: measured at the site, supplied by the client, or assumed in the absence of data. Assumptions are listed in the written scope next to the conclusions that depend on them, with the condition that would confirm or displace each one. If an assumption later proves wrong, the scope returns to the point where it was used and the file records the original input, the new fact and the revised reasoning.

What does a client receive at the end of an assessment?

A written account of the site's demand pattern and constraints, the data gaps and their consequences, the options considered including a no-change route, and a recommended path with its assumptions, inclusions, exclusions and decision points. Responsibilities for licensed trades and network applications are named. Where staging is recommended, the scope states what the first stage will measure and which decision that measurement informs. The assessment can be commissioned on its own and taken elsewhere.

What records does the assessment start with?

Twelve months of bills, interval data where it exists, the current tariff schedule, a roof or site plan and a description of operating hours. Where a document is missing, the gap is recorded so the conclusion states what it depends on.

How is a missing input treated?

As a stated gap rather than an assumption. The written position says which conclusion the missing record would change and what the uncertainty means. A recommendation resting on an assumed load is labelled provisional.

Does every assessment lead to equipment?

No. The sequence can end in a controls change, a tariff correction, a staged development or a decision to wait. Ending at the first correct step is the point of the exercise.

Who confirms structural and electrical adequacy?

A qualified structural engineer certifies roof capacity, and licensed electrical contractors carry out and certify the electrical work. The office coordinates those inputs and records them in the scope.

Client comment

On the order of the questions.

A comment on the sequence the assessment follows.

“

The order of the questions was the useful part: load, then roof, then connection. It stopped us buying equipment to solve the wrong problem.