An advisory engagement where the question was whether to buy generation, and the answer was to examine controls and tariffs first.

This account is an illustrative example of the company's method. Client names and commercial figures are not published; findings are qualitative and rest on documents the client supplied.

The brief and the scope

The request was framed as a purchase. A client with several occupied premises wanted generation across the portfolio and asked what plant should be installed, and where. The office asked to see the electricity data first. The client agreed to a consulting review with no commitment to buy anything at the end of it.

The deliverable was a set of findings and a decision, not a construction programme. The scope stated at the outset that the review could recommend no generation at that stage. No installation was assumed and no financial result was promised.

Evidence gathered and reconciled

The engagement began without a site visit. Twelve months of bills were requested, together with the interval data behind them, the current tariff schedule, meter records for each premises and available control settings for major plant. The billing record used the same units at every address and could be aligned week by week, which allowed the engineers to separate what was common to the portfolio from what belonged to a single site.

Reconciliation preceded analysis. Dates were aligned across the billing and interval records, estimated reads were marked, and gaps were listed in the report instead of being bridged by an average. Where a premises had been billed on an estimate for a period, that period was excluded from the demand comparison. The report identified exactly which weeks had been used. Every statement in the findings traced back to a document the client held.

Three findings

Recorded demand events were driven by short simultaneous start-up ramps rather than steady operation: several items of equipment were being brought on at the same time at the start of a shift, each drawing its start-up current at the same moment. The pattern was consistent across sites, indicating a scheduling practice rather than a fault at any one premises.

The operating schedule had been set under an older tariff assumption and no longer matched the structure the client was billed under. The tariff carried a demand component that penalised short peaks. Some plant ran a fixed time schedule that ignored whether the space was occupied, and one item was set to re-energise automatically after a short pause, repeatedly recreating the ramp the demand charge measured.

The metering arrangement aggregated separate circuits in a way that obscured which premises was responsible for an event. Circuits were reviewed separately where the records allowed, and the limits of the available data were stated in the report. Where the record could not support attribution, the report said so.

None of the three findings required new plant. They required changes to scheduling, to control settings and to how the metering data was read.

Billing, interval and tariff records reconciled across the portfolio before any recommendation was drafted.
Plant control settings checked against the operating schedule and the current tariff structure.

Recommendations

Changes to start-up sequencing were recommended first: reorder the start-up and stagger the timing so the equipment no longer draws start-up current simultaneously. The effect could be checked in the interval data without waiting for any installation to be commissioned.

The operating schedule at each premises was recommended for revision against occupancy and the current tariff. The metering arrangement was recommended for review so demand events could be attributed to a premises and a cause, separating aggregated circuits where the records allow.

Generation was advised against in the first stage. Adding plant would not have changed the timing of the start-up ramps, and the metering still could not identify which premises created them. The advice to defer was written as a decision with reasons and review conditions, not a rejection of generation in principle.

The report separated findings from assumptions. A finding was something that could be pointed to in a document the client held; an assumption was marked as such, with the condition that would confirm or remove it. Findings were organised by cause rather than by site, so the same reasoning applied across the portfolio without repeating the analysis.

Verification and review conditions

After the control changes, the demand pattern was measured again against the same baseline method and the same data source. The review set out what a later generation question would need to answer: which demand events remained after the control changes, when they occurred, and which premises created them.

The sequence for reopening the generation question was recorded: separate the aggregated circuits where the records allow, review the tariff again against the new operating pattern, then assess generation against a load that is understood. A review date replaced a procurement timetable.

Outcome

Generation was declined in the initial stage. Control changes were made to the operating schedule and to the sequencing of plant start-up, and the demand pattern was verified against the baseline data source. The client kept the option to revisit generation at the agreed review. The engagement ended with a documented decision and the conditions of the next decision written down in advance.

Document-based findings

Every finding traceable to billing, interval, tariff or control records supplied by the client.

Verified against interval data

Post-change demand pattern measured against the same baseline method and data source.

Decision documented

Generation deferred with written reasons, review conditions and a review date.

Questions about this project

Why did the review start with documents rather than site visits?

The client operated several premises. Visits to each would have produced impressions that were difficult to compare, while the billing and interval records used the same units at every address and could be aligned week by week. Starting from the records let the engineers separate portfolio-wide patterns from site-specific ones, and made every finding traceable to a document the client held.

What was actually driving the demand charges?

Short simultaneous start-up ramps. Several items of equipment were energised together at the start of a shift, each drawing start-up current at the same moment, and one item re-energised automatically after a short pause, recreating the ramp repeatedly. The tariff's demand component measured those brief peaks. The cause was sequencing and control settings, not insufficient plant capacity.

How were estimated reads and data gaps handled?

Estimated reads were flagged during reconciliation, and any period billed on an estimate was excluded from the demand comparison. Gaps were listed in the report rather than filled with averages. The report identified which weeks entered the comparison, so the recommendation could be checked against its inputs.

Under what conditions would generation be reconsidered?

Three conditions were written into the review: the control changes verified against the baseline data source, aggregated metering circuits separated where records allow so events can be attributed, and the tariff reviewed against the new operating pattern. A later generation assessment would then be sized against the remaining, understood demand events rather than the original bill.

Why was generation deferred?

The demand peak was produced by overlapping plant sequences and a tariff that charged for it, while control settings held equipment running when it was not needed. Correcting those was cheaper and produced a measurable change before any capital was committed.

What did the tariff review establish?

Which charges responded to load shape, which responded only to total consumption, and what the network's definition of the peak actually was. That defined the target: the intervals to reduce, in the hours they occurred.

How were control settings assessed?

Against the operating schedule. Setpoints, sequencing and time clocks were compared with when the plant was actually required, and the adjusted settings were trialled before being adopted.

Client comment

On the decision not to buy.

A comment on the review's conclusion.

“

The review said not yet, and explained what to fix first. That answer was worth more than a proposal.