How we work

Six stages from first contact to handover

A defined sequence keeps the work accountable. Each stage has an input, an output and a point at which the client can decide whether to continue.

The sequence below applies to a commercial or industrial enquiry. A stage can end with a decision to proceed, a request for more information, or a recommendation that the project stop. Every stage produces a document or record the client keeps. Nothing is treated as agreed until it is set down in writing, and no stage begins before the previous one has returned its output.

SixDefined stages
OneOffice in Moorebank
OneWritten scope per engagement
SixDecision gates

The six stages, end to end

Each stage is a separate commitment with a defined output. The order is the order in which evidence becomes a decision and a decision becomes a document.

01

Enquiry

The client describes the site and the question. Location, site type, the prompt for the enquiry and any timing constraint are recorded. No decision is requested at this point and no price is offered. The purpose is to establish whether the question falls within the company's scope and what information would allow a proper answer. If it does not, that is stated here. The response names who holds the enquiry and what happens next.

02

Site and load review

Interval electricity data, bills, a site plan and whatever information exists about the roof, switchboard and connection are worked through. Where a visit is useful, it is arranged from the Moorebank office. The output is a plain account of what the site does and what limits it: demand pattern, operating hours, surface condition, available capacity and export constraints. Gaps are listed explicitly. Measured facts are separated from assumptions here, because every later stage inherits the distinction.

03

Options

The credible routes are set out from the review. More than one may exist, and one may involve no new capital yet. Each option is described by what it would do, what it would require, what it would not achieve and what could prevent it. Staging is explored where a first step can answer a question that the second depends on. Client priorities shape the direction at this stage, because priorities cannot be inferred from a load profile.

04

Written scope

The chosen route becomes a document. It states the question, the information used, the assumptions, the recommended path, the inclusions, the exclusions and the decision points. It names who is responsible for licensed trades and for network applications. It also states the conditions under which the scope should be revisited. Signing at this stage approves a defined piece of work with stated boundaries.

05

Delivery coordination

Where the scope includes physical work, the office coordinates the programme. Licensed electrical trades carry out licensed work, and network applications follow the appropriate processes; those responsibilities are identified in the scope rather than assumed. Progress is tracked against the document, variations are recorded as they arise, and changes return to the client for agreement before being absorbed into the work. The Moorebank office stays as the single contact point throughout, including when a programme slips.

06

Handover

At completion the records are assembled: what was installed, what was tested, what was commissioned and what the client needs to operate and maintain it. Documents and settings are gathered in one place and explained at the handover conversation. Outstanding items are listed with their status. The office that received the enquiry remains available afterwards for questions about the file.

ProgrammeDelivery is tracked against the written scope, and variations return to the client for agreement before work continues on the affected part.

What each stage consumes and returns

This table is the compact version of the sequence. It is used to check whether a stage has returned its output before the next one begins.

StageWhat is neededWhat is returned
EnquirySite type, location, the question, any timing constraint.A response confirming scope, next step and missing information.
Site and load reviewInterval data, bills, site plan, roof and connection details.A written account of demand, constraints and data gaps.
OptionsThe review, the client's priorities and appetite for risk.Comparison of credible routes, including staging and a no-change route.
Written scopeA chosen route and agreement on boundaries.A scope with assumptions, exclusions, responsibilities and decision gates.
Delivery coordinationAccepted scope and access to the site.Progress records, agreed variations and clear responsibility for licensed work and network processes.
HandoverCommissioning records and a client contact.A consolidated record of what was delivered, tested, set up and left outstanding.
Stage output

Every stage returns a document or record the client keeps: a scope-fit response, a review, an options comparison, a scope, progress records or a handover file.

Input labelling

Measured data and assumptions are labelled separately at review and remain labelled in the scope that follows it.

File location

The enquiry file, the scope and the handover record are held at the Moorebank office from first contact to final question.

When a stage says stop

A review may reveal a roof that cannot carry equipment, a connection that cannot accept export, or a load that does not support the case. The finding is reported in writing, the proposal ends, and the client keeps the work product of the stage that produced the finding.

Decision gates between the stages

A gate is a defined point at which a particular fact must exist before the next stage is worthwhile. Each gate is marked in the written scope, so both parties know what must be true before work continues.

After enquiry · scope fit

Is this a commercial or industrial question the office can answer, and has the information needed to answer it been identified? If not, the process stops here with a written explanation.

After review · evidence

Are the load, the fabric and the connection understood well enough to compare options? If a critical input is missing, the gate holds until it is supplied or the conclusion is explicitly limited to what is known.

After options · direction

Which route does the client wish to pursue, and which risks are acceptable? Priorities are not chosen on a client's behalf, so this gate belongs to the client.

Before scope acceptance · boundaries

Are the assumptions, exclusions and responsibilities stated clearly enough to approve? An unsigned scope is not an approval, and work does not begin on one.

During delivery · variation

If a site condition differs from the scope, work on the affected part pauses while the change is recorded and agreed. Unaffected work may continue, but the variation is not absorbed into the programme without a decision.

At handover · completeness

Are the records, settings and outstanding items assembled and explained? The project is not closed until that has happened, whether or not the equipment has been energised.

Gates are placed before commitment. A client who stops at a gate keeps the work already completed — the review, the options or the scope — and does not proceed to equipment ordered on an assumption that has since failed.

Responsibility, change and continuity

Licensed trades remain responsible for licensed work. Network applications follow the processes of the relevant network and are identified by name in the scope. The office coordinates, records and reports. The table below names the parties so a client can see who is accountable for each obligation.

PartyResponsibilityWhat the client should see
The Moorebank officeReceives the enquiry, assembles and interprets site data, records assumptions, prepares options and the written scope, and coordinates the programme against that scope.A named contact, a written account of the review, the scope and the handover records.
Licensed electrical tradesCarry out licensed electrical installation work and the testing associated with it.Commissioning and test documentation referenced in the handover file.
Qualified structural partiesAssess roof capacity where the proposed plant depends on it.A written assessment recorded as a condition of proceeding.
The networkAdministers the connection process and the export conditions that apply to the site.Connection correspondence and any conditions that affect the design.
The clientSupplies accurate site information, decides at each gate, provides access and approves variations before they are absorbed into the work.Signed decisions at the gates and a clear record of any direction given.

How is a change handled?

What changed, which part of the scope it affects and what agreement is needed are written down before work continues on that part. A variation is judged against the original document. If the change alters the practical or commercial case, that is stated, including when the better advice is to stop.

What causes a delay?

Common causes include late information, a site condition that differs from the scope, a connection process that takes longer than expected, or a client decision held at a gate. Where the cause sits with the office, it is recorded and the programme adjusted. Where it sits elsewhere, it is identified so it can be managed.

Does a delay change the advice?

Not automatically, but a long delay can make an assumption stale. A tariff, a roof condition or an operating pattern may no longer match the review. The affected assumption is reopened before work continues.

Why a stage can end the project

Each stage has its own stopping conditions, and the reason is recorded in the same file that would have carried the project forward.

A review can end the proposal when the physical facts do not support the question: a roof that cannot carry the plant, a switchboard without capacity, a connection that cannot accept export, or a load too steady to give a battery a duty. Options can end it when no route offers a credible case, including the route of doing nothing yet. Scope can end it when client and office cannot agree on boundaries. Delivery can end it when a variation changes the basis of the work enough that the original decision no longer applies.

In each case the client keeps the work product of the stage that ended the project. A written reason for stopping can be acted on — by changing the site, waiting for a tariff to change, or asking a different question. The Moorebank office holds the record, so the reasoning is available if the subject returns months later.

Questions about the process

How long does each stage take?

Durations depend on the inputs rather than on a fixed schedule, so no completion date is promised before a scope exists. An enquiry response follows once the site type and question are understood. The site and load review depends on how quickly interval data, roof information and connection details can be obtained; where the meter provider or the network must supply a document, that wait governs the stage. Options and scope preparation follow the review. Delivery coordination runs to the programme agreed in the scope, which includes network processing time and any shutdown windows the site requires. The scope states the dependencies for each stage so a client can see what a delay would be attributable to.

Who holds responsibility at each stage?

The Moorebank office receives the enquiry, interprets site data, records assumptions, prepares options and the written scope, and coordinates the programme against that scope. Licensed electrical trades carry out licensed installation work and its associated testing. Qualified structural parties assess roof capacity where the proposed plant depends on it. The network administers the connection process and the export conditions. The client supplies accurate site information, decides at each gate, provides access and approves variations. These allocations are named in the scope rather than left to customary practice.

What happens if a stage stops the project?

The finding is reported in writing with the evidence behind it, and the proposal ends at that stage. The client keeps the output already produced: the review, the options comparison or the scope. No equipment is ordered on an assumption that has failed. The file records what would have to change for the question to be reopened, so a later roof renewal, tariff change or operating change can be tested against the original assessment instead of starting again.

How are changes during delivery handled?

Work on the affected part pauses while the change is recorded: what differs from the scope, which drawings or assumptions it touches, and what agreement is required. Unaffected work may continue. The variation is assessed against the original document and returned to the client for a decision before it is absorbed into the programme. Where the change alters the practical or commercial basis of the work, that is stated plainly, including when the recommendation is to stop rather than proceed.

What records are handed over at completion?

A consolidated file covering what was installed against the approved layout, electrical test and commissioning documentation from the licensed trades, protection and control settings as installed, metering configuration showing generation, consumption and export separately, operating notes, and a list of outstanding items with their status. Structural assessments and network correspondence are referenced where they formed conditions of the work. The records are explained at the handover conversation and held at the Moorebank office for later questions.

How does an enquiry move through the office?

Enquiry, review of records, options tested, written scope, delivery against that scope, handover with records and outstanding items. Each step produces a document the next step relies on.

Can stages run in parallel?

Where dependencies allow. A structural check and a connection enquiry can proceed together once the site records are read; equipment selection cannot begin before both answers are known.

How are shutdown windows and production constraints handled?

They are design inputs. Isolation points, cable routes, access and the duration of each task are planned around the window the site can give, and the programme is set from that window rather than from a preferred construction sequence.

What is handed over at completion?

As-installed drawings, protection settings, metering arrangements, operating notes, test documentation and a list of outstanding items with status. The records allow a later change in output to be checked against the original sizing.

Start the sequence

Put a site question into the process.

A short description is enough to begin. The office will say which records it needs for the first step.

The suburb, state and premises type.

What has changed, or the question the site needs answered.

Whether a shutdown window, lease event or budget date sets a deadline.

The form prepares a message in your own email program, addressed to the Moorebank office. Nothing is sent until you send it. Details are used only to answer the enquiry, as described in the Privacy Policy.