Home / Solutions / Energy Efficiency & Consulting
Solution 04 — Advice
Energy Efficiency & Consulting
Sometimes the best return comes from using less, not generating more. Our consulting work reads how a site actually consumes electricity and sets out what would change that, in writing, whether or not the client acts on it.
Standalone advice
An engagement that ends with a document
Efficiency work begins with a meter record, not a panel layout. A review can be commissioned on its own terms: the office examines a site, produces a written set of findings, and stops there. No equipment follows unless the client asks for it. A recommendation that avoids a capital purchase is recorded with the same evidence as one that leads to an installation.
The written report is the deliverable. An engineer may conclude that the existing plant is sound and that the remaining opportunity sits in generation, in which case the document says so and points toward the relevant scope. A client who declines every recommendation still receives a record of what was found and why.
Twelve months of bills are the preferred starting material, with half-hourly data where the meter can supply it. One bill establishes a price. A year of intervals establishes behaviour: when the site is busy, when it is idle, and what it continues to do after the last person leaves. These engagements suit a single building or a portfolio, and they are especially useful where a site has run for years without anyone reading the interval record closely.
Bills and interval data before a site visit. A desktop pass narrows the search; the visit verifies what paper cannot. The written scope states the information required, the report format and the point at which the engagement ends.
The method
How the review proceeds
The review follows a fixed order: read the consumption record, match the tariff to the behaviour, state the limits of the evidence, then separate practice and controls from capital purchases. The depth applied to each step depends on the decision the client wants help with.
Read the record before prescribing
Consumption is plotted against time of day and day of week, then compared with the operating hours the site reports. Gaps between the two are where findings usually sit. A warehouse that claims a seven o'clock start but draws a steady base load at three in the morning has a plant schedule, a security circuit or a refrigeration fault that nobody has quantified. An office with a pronounced Monday spike may be bringing air handling up from a weekend setback too early. Each observation points to an action with an identifiable cost and a testable result.
Match the tariff to the behaviour
Demand charges are easy to overlook on a bill dominated by consumption charges, yet a few minutes of peak activity can set them for the month. The maximum demand record is examined alongside the average, and the plant responsible is identified. A site on a flat rate may be better served by shifting load than by reducing it; a site on a demand tariff may gain from changing start sequences rather than buying anything at all. Tariff review often precedes any plant decision for this reason.
Name the uncertainty
A desktop review cannot confirm the condition of a fitting, the setpoint on a controller or the leakage rate of a compressed air system. It identifies where to look, which turns the subsequent visit into a short, targeted exercise. Where a conclusion rests on an assumption about operating hours that the client has not confirmed, that assumption is printed beside the conclusion.
Keep the sequence a client decision
Capital is considered only after practice, scheduling and controls have been addressed. Reducing the base load first changes the size of any later array or battery, so the order of work changes the capital required. Recommendations are separated into those three groups so that a client can accept the first two and defer the third. Where one measure alters the load that another would have served, the interface is recorded in both places.
Where the load hides
Six places to look before buying anything
Most recommendations concern plant that is already installed. The checks below are ordered by how often they produce a result that can be verified within a billing cycle. A compressor left running over a weekend, a cold room defrosting three times where once would do, an air handling plant starting two hours before occupancy: these are ordinary findings, and none requires a roof array or a battery.
Lighting
Operating hours, control zones, fitting condition and whether lights stay on after occupancy ends. Switching patterns are examined before luminaires are specified, because a control that exists but is set incorrectly is a common finding.
Refrigeration setpoints
Cold room and display case temperatures, defrost schedules and condenser cleanliness. Small setpoint changes can matter more than new plant, and a defrost cycle running three times where once would do is a measurable load.
Compressed air
Leakage, compressor sequencing, receiver sizing and whether air runs across idle shifts. Often the largest avoidable load in a workshop, and one that the night-time record exposes plainly.
After-hours plant
What remains energised when the site is empty, from exhaust fans to office equipment. The overnight base load is the indicator; anything above a modest floor deserves an explanation.
Controls and scheduling
Time clocks, sensors, setback periods and manual overrides. The record is checked against what the operator believes is programmed, since the two frequently disagree.
Tariff structure
Demand charges, time-of-use periods and network fees matched against the actual consumption profile rather than the account name. A brief peak at the wrong hour can shape a whole year of charges.
What the desk can and cannot establish
Evidence, and the limits of it
None of the items below needs to be perfectly formatted; legible copies are enough. Where an item is missing, the gap is recorded and the conclusions that depend on it are marked provisional rather than filled with an assumption. A short visit later is then spent verifying specific points instead of gathering general background.
The decision the client wants help with matters more than any other input. It sets the depth of the review. A question about a single peak is answered with a narrower document than a question about a portfolio's capital programme, and the report says which question it was written to answer.
| Item | Detail requested |
|---|---|
| Electricity bills | Twelve consecutive quarterly or monthly bills, showing demand charges, network fees and the tariff label. |
| Interval data | Half-hourly consumption for the same period where the meter or the account holder can supply it, in any readable format. |
| Account context | Which entity holds the account, who receives the bills, and whether the premises is leased or owned. |
| Operating hours | Normal shifts, weekend operation, shutdown periods and seasonal peaks as the operator understands them. |
| Plant schedule | Major equipment, running patterns and known maintenance or control issues, including refrigeration and compressed air. |
| Drawings | Single-line diagram, switchboard schedule and any lighting or floor plan already held on site. |
| Prior work | Earlier reports, completed efficiency measures and outstanding recommendations, so the same work is not proposed twice. |
| The decision | What the report is meant to help the client decide, and by when. This shapes the depth of the review more than any other input. |
Every recommendation carries an indicative effort level and a note on how its effect could be checked. A baseline is fixed from interval data over a representative period before any change is made, with the billing definition recorded and a normalisation agreed for weather, production or occupancy, so the effect of a measure can be verified against the next billing cycle.
Client choices
What a client may decline
Nothing in a consulting engagement requires the recipient to act on a recommendation. A measure may be rejected because the operational disruption is unacceptable, because capital is unavailable, or because the reading of the data is disputed. The reason need not be given to the office, though recording it internally often helps a later review. The report sets out evidence, assumption and consequence together, so a decision made now can be revisited on its merits later.
Parts of the process may be declined as well. If a site visit is proposed, the office can be told that only the desktop material is to be used, with the resulting limits stated in the report. If a recommendation involves equipment, it may be removed from the scope while the no-cost measures are retained. Where the review shows that generation is the better path, that finding can be taken elsewhere; the document contains nothing that depends on this company's involvement to remain readable.
One boundary applies to amendments. Where a report is amended at a client's request to remove a finding, the original advice stays on file and the edited version is not presented as the unchanged conclusion. A course of action that has not been assessed cannot be certified.
Albeta Energy works from its single office at 12/43 Heathcote Road, Moorebank NSW 2170. The company is not an electricity retailer and does not install residential systems. Enquiries about a commercial or industrial site can be directed to the office on 02 7201 8622 or by email to info@albetaenergy.com.au.
Common questions
Questions about consulting
What data does a consulting review need?
Twelve consecutive bills showing demand charges, network fees and the tariff label, half-hourly interval data for the same period where available, the account holder and tenancy arrangement, operating hours and shift patterns, a plant schedule, any single-line diagram or switchboard schedule held on site, and records of earlier efficiency work. The decision the report must support is requested with the data, because it sets the depth of the review.
What is the difference between a desktop review and a site visit?
A desktop review reads bills, interval data and drawings; it identifies patterns and narrows the search but cannot verify physical condition, controller setpoints or compressed air leakage. A site visit is scoped from the questions the paper could not settle, so it is short and targeted. Where a finding depends on equipment condition or control behaviour, the report states that a visit is required before the recommendation can be relied on.
Can the review be limited to the tariff?
Yes. A tariff review establishes which charges respond to load shape — demand charges, time-of-use periods, network fees — and which do not, and what a change in operation or supply arrangement would affect. The maximum demand record is examined alongside average consumption and the plant responsible for peaks is identified. A tariff review can conclude without any equipment being proposed.
Which measures avoid buying new plant?
Correcting time clocks and setback periods, rescheduling air handling and compressor starts, repairing compressed air leaks, adjusting refrigeration setpoints and defrost cycles, switching lighting zones to match occupancy, and staggering plant sequences that create demand peaks. These are checked before capital items because they change the load that any later array or battery would serve.
What happens if a recommendation is declined?
Nothing further is required. The report stands alone and remains on file with its evidence and assumptions, so the decision can be revisited later. Equipment recommendations can be removed from the scope while no-cost measures are retained, and a finding that generation is the better path can be taken to another provider. The engagement ends with the document.
Next steps
From advice to plant
Where the review concludes that generation is the right response, the natural next scope is solar PV or, where evening demand justifies it, battery storage. Where several measures and loads must be coordinated, commercial power solutions may be more appropriate. The report itself records which of those paths the evidence supports.
Bring twelve months
Bills and interval data give the review its foundation.
Name the decision
State what the report is meant to help you decide.
Keep the document
It remains useful long after the financial year it describes.
Decline freely
A recommendation you reject is still a valid result.
Reduction
Reduction before addition.
The cheapest unit of energy is the one the site no longer needs.
A review reads the tariff, the interval profile, the control settings and the maintenance state together. A demand peak built from overlapping plant sequences is a scheduling question before it is a storage question; a base load that runs through empty hours is a controls question before it is a generation question. Separating those causes is the work.
A baseline is then fixed before any change, from interval data over a representative period, with the billing definition recorded, circuits isolated where necessary and a normalisation agreed for weather, production or occupancy. Without that, a later comparison measures the season rather than the measure.
Where a measure is justified, the review states the expected effect and how it will be verified. Generation is considered after reduction, because a smaller array serving a reduced load is usually a better use of capital than a larger array serving waste.
Consulting work
Advisory and efficiency projects.
Two engagements where review and measurement produced the result.
Client comment
On finding the saving first.
A comment on the result of a controls-first review.
“The review found the saving in the controls, not in the equipment. It was the cheaper answer and it was correct.
Commission a review
Ask for an energy or tariff review.
Bills and interval data are the main inputs. The scope says what will be examined and what will not.
Which charge or pattern prompted the review.
Whether interval data is held, and in what resolution.
Whether a baseline will be needed for later verification.
The form prepares a message in your own email program, addressed to the Moorebank office. Nothing is sent until you send it. Details are used only to answer the enquiry, as described in the Privacy Policy.