Home / Sectors / Commercial Premises

Sector 01

Commercial Premises

Offices, retail floors, showrooms and professional suites. These buildings are occupied by people during the day, controlled by several parties at once, and rarely as simple as their floor area suggests.

Occupation, consent and shared fabric

Commercial premises are defined by daytime occupation. The building fills in the morning, empties in the evening and carries a small base load overnight. That pattern favours generation, because the array produces while the building is occupied, but it also bounds the useful capacity by the hours people are present. The interval record is plotted against stated occupancy first, and what remains on after hours is checked second. Air handling that starts before the first arrival, security lighting and reception equipment often account for the overnight floor.

In a strata building or a multi-tenanted office, the roof may be common property, the switchboard may serve several tenancies and the retail account may sit with a managing agent rather than the occupier. Consent has to be assembled from parties whose interests differ. A landlord may want the asset improved while remaining concerned about penetration, warranty and disruption to tenants. A tenant may want lower consumption without any authority to authorise work on the roof. These relationships are recorded early, because a technically sound proposal that lacks consent cannot proceed.

FIG 01On commercial premises the roof and the switchboard are often shared assets.

What an office brief has to account for

Six conditions recur often enough to shape the opening questions. None of them is decisive on its own, and several can appear together on the same floor.

Daytime occupation

Demand follows working hours. Generation aligns well, but the export case depends on how much of the array's output the building actually uses during those hours.

Shared services

Air handling, lifts, lighting and security may serve several tenants. Their schedules influence the base load more than individual tenant equipment does.

Strata and consent

Common property, owners' corporations and landlord approvals form a consent chain. The parties who must agree are identified before design work is committed.

Roof plant and heritage

Rooftop plant, parapets and sometimes a heritage overlay restrict where panels can sit and how they may be fixed to the structure.

Switchboard age

Older boards may lack space, spare ways or modern protection. Capacity is assessed before inverter and storage sizes are fixed.

Retail refrigeration

Showrooms and retail floors carry display cases and cold rooms whose night behaviour can surprise an office-focused assessment.

Getting the size and the boundary right

Roof area invites a larger proposal than the load can absorb, and an export limit may leave the extra panels idle for much of the day. Capacity is sized against the site's own consumption and the connection conditions that apply, then checked against the available area rather than the other way round. Where a building has a restrained daytime load but a roof that could hold far more, the document states that additional capacity would be exported at little benefit or curtailed.

Sizing input — roof area

What the roof can carry

Available area, orientation, shading and structural reserve set the physical maximum. Area alone does not establish how much output the site can use.

  • Clear area after plant, parapets and shade.
  • Structural reserve verified by an engineer.
  • Fixing method consistent with the membrane and any warranty.
Sizing input — electrical record

What the load and connection allow

Consumption and the connection agreement set the usable limit. Panels beyond what the site can use or export add cost without adding useful output.

  • Size against the consumption profile first.
  • Verify the export ceiling before fixing capacity.
  • Record curtailment where the limit binds.

Tariff review often precedes any plant decision. A commercial account may carry demand charges, time-of-use periods and network fees that behave quite differently from a residential tariff. The maximum demand record is examined alongside the consumption profile, because a single late-afternoon peak can shape the economics of the whole site. Where the tariff rewards load reduction more than generation, that sequence is recommended. Where evening consumption is expensive, storage may have a role, but only if the site's own evening tail is large enough to justify it.

Storage on commercial premises is conditional. An office that empties at six has little evening demand to serve, so a battery installed for self-consumption has a weak case unless it addresses a demand charge or supports specific circuits. A retail site with late trading and refrigeration that continues after closing presents a different picture. Storage is specified for a stated duty and is not recommended where the evening tail does not support the case.

The retail account boundary is drawn carefully. No accounts are held and no retailers are changed. The account stays with its current holder, and any change to metering or connection arrangements is agreed with the retailer and the network operator through the proper channels. The scope concerns equipment inside the premises and the way it is coordinated.

Strata, tenancy and the chain of approval

In a strata or multi-tenanted building the roof is rarely a simple surface belonging to one party. It may be common property held by an owners' corporation, demised to a particular tenant, or carrying plant that serves several occupiers. Each arrangement produces a different consent chain, and the chain must be mapped before a layout is fixed. The opening questions are practical: who owns the roof, who holds the retail account, who controls the switchboard and who would receive the benefit of any generation. Where these are four different parties, the technical design is only one part of the problem.

Landlord and tenant usually want different things. A landlord may see an array as an improvement to the asset but remain concerned about penetration, membrane warranty and disruption to occupiers during installation. A tenant may want lower consumption but have no authority to approve work on common property, and may be uncertain about remaining long enough to recover a contribution. Those positions are recorded rather than assumed to align. Where benefits and costs fall to different parties, the mismatch belongs in the brief as a decision for the parties to resolve.

Owners' corporations add a further step. Approval may require a general meeting, a specialist report on the structure or a formal licence over common areas. These requirements have their own timetable. They are identified early so that they run in parallel with the technical review rather than after it. On commercial premises, consent determines the programme as much as weather or equipment availability does.

After-hours plant and hybrid attendance

An office that empties at six still draws power. Air handling may start before the first arrival and continue into the evening; security lighting, access control, lifts and reception equipment form a night-time base; and cleaning contracts often place their heaviest use after the building appears shut. The interval record is plotted against the stated working pattern precisely because the two seldom agree. The resulting picture decides whether an evening tail is large enough to justify storage, or whether the overnight floor is better addressed by controls.

Hybrid attendance can spread a formerly sharp daytime peak across more hours and into days that used to be quiet, while a single late finish in one tenancy can keep a shared service running for the whole floor. Normal days are asked about rather than ideal ones, and planned changes in attendance are recorded. A design based on a five-day pattern that no longer applies will mis-size both generation and controls, and the error only appears once a full year of data is available.

Retail and showroom floors add a load that an office-focused assessment can miss. Display refrigeration and cold rooms continue after the shop closes, often with defrost cycles that create a short overnight peak. Their behaviour differs from the office load above them, and it can be the reason a battery has a case where the office itself would not. The refrigeration schedule and setpoints are recorded, compressor start times identified, and that information treated as part of the same site picture. Where the case for plant rests on after-hours load, it is verified before anything is recommended.

Switchboard capacity in older buildings

Commercial buildings from an earlier era frequently have switchboards that were never intended to accommodate generation. Space may be limited, spare ways absent and protection settings documented only on a faded label. Age, condition, available ways and protection arrangement are recorded before any equipment size is fixed, and an upgrade is identified as a prerequisite where that is what the board requires.

Where the board is the limiting element, that finding is reported plainly. It often changes the sequence: a switchboard renewal may need to be scoped and funded before generation is considered, and an array that looked straightforward on the roof becomes a staged project. The same applies to metering arrangements shared between tenancies, where the ability to measure what an array produces may be as constrained as the ability to install it.

Questions that settle the brief

Does heritage status rule out solar?

Not necessarily, but it changes the fixing and visibility options. The constraint is identified early and the relevant consent sought through the proper pathway before a layout is fixed.

Does display refrigeration change the recommendation?

It can. A shop floor with cases and cold rooms running after closing has an evening load that a pure office does not. That load is verified from interval data before it is used to justify storage or a different operating schedule.

When is consulting the better first step?

Where after-hours plant, refrigeration setpoints or tariff structure appear to offer larger gains than generation, a consulting review should come first. Any later array is then sized against the reduced load.

How are common-area loads treated?

Separately from tenanted loads. Lifts, lighting and shared services may sit on the owner's meter, and generation serving them needs an arrangement the lease supports. Where the boundary is unclear, sub-metering establishes it.

What should a managing agent provide at the first enquiry?

The tenancy schedule, the current lease term, the metering arrangement, recent bills for the account in question, and any roof or building report already held. Those five items usually settle whether the site can proceed.

Common questions

Questions about commercial premises

How does strata consent work?

Where the roof is common property, approval follows the building's own process: a resolution of the owners' corporation, often a general meeting, a common-property agreement or licence, and sometimes a structural or membrane report. The evidence the proposal needs — structural position, metering and benefit — is assembled before the meeting. The requirement is identified early so it runs in parallel with the technical review.

What are the landlord's and tenant's roles?

The landlord or managing agent usually controls the roof, the switchboard and any work on common property; the tenant usually holds the retail account and receives the consumption benefit. A tenant cannot authorise roof work without the owner's consent. The lease and the managing agent's records establish who approves what, and where costs and benefits fall to different parties the mismatch is recorded for them to resolve.

Why does after-hours plant matter?

Because an office that empties at six still draws power: air handling starting before occupancy, security lighting, access control, lifts, cleaning equipment and retail refrigeration with overnight defrost cycles. The interval record is plotted against the stated working pattern, and the overnight floor decides whether controls or storage are justified. Hybrid attendance and late finishes in one tenancy can keep shared services running for the whole floor.

How does switchboard age affect the project?

Older boards may lack spare ways, physical space and modern protection. Condition, capacity and protection arrangement are assessed before inverter and storage sizes are fixed. Where the board is the limiting element, a renewal is scoped as a prerequisite and the project becomes staged, rather than designing around an unstated assumption.

How is the array right-sized?

Against the site's own consumption profile and the export ceiling in the connection agreement, then checked against the available roof area — not the other way round. Where the daytime load is modest and the roof large, additional capacity would be exported at little benefit or curtailed, and the document says so. A small array serving the actual daytime load is usually the better proposition.

Related work

Beyond a single building

A commercial portfolio may also need development to coordinate multiple sites, generation where the roof and load align, or an integrated arrangement where several loads must be managed together. Albeta Energy works from its single office at 12/43 Heathcote Road, Moorebank NSW 2170 and is not an electricity retailer.

i

Consent first

Establish who controls the roof and switchboard.

ii

Size to load

Let consumption and export limits set the array, not roof area.

iii

Check the tail

Storage needs an evening demand worth serving.

iv

Keep boundaries clear

The retail account stays with its holder.

Tenancy

Who controls the roof and the board.

In a tenanted building the technical question is preceded by an ownership question.

A commercial tenancy rarely carries control of the roof, the switchboard or the meter. The review establishes who owns each element, who consents to work on it, and who receives the benefit of generation before a design is drawn. A landlord may hold the roof, the tenant may hold the account, and the managing agent may hold both correspondence and access.

Metering boundaries then decide the arrangement. Generation behind a tenant's meter benefits that tenant; generation ahead of it requires an agreement the lease may not contemplate. Where several occupants share a supply, the share of benefit is settled in writing before installation, because a technically sound system with an unsettled commercial arrangement is a dispute waiting to happen.

Low daytime load is the common constraint. Offices with heavy morning and evening use, retail with intermittent cooling, and professional suites with servers running overnight each produce a different overlap between generation and demand. That overlap, not the roof area, sets a practical array size.

Client comment

On settling ownership first.

A comment on the order in which the tenancy questions were resolved.

“

The ownership and metering questions were settled before any equipment was discussed. That saved a redesign later.

Managing agentCommercial building, North Sydney

Scope a tenancy

Send the building and tenancy facts.

Ownership, metering and the lease term decide whether a commercial project can proceed.

Who owns the roof and the switchboard, where known.

Whether the account is the tenant's or the owner's.

The lease term remaining, and any make-good obligation.

The form prepares a message in your own email program, addressed to the Moorebank office. Nothing is sent until you send it. Details are used only to answer the enquiry, as described in the Privacy Policy.