Home / Resources / Preparing an Enquiry

Resources

What to gather before you contact us

A short preparation makes the first exchange more useful. The site facts and documents below help the office answer a commercial or industrial enquiry; the material that is not needed is listed further down.

A complete package of documents is not required to make contact. The opening conversation concerns the site and the question; the detailed material follows once the office has identified which facts would change the answer. A small set of inputs is consumed by almost every site review, and having them ready can remove an entire round of correspondence. The object is not to make an enquiry more formal, but to let the first exchange begin on the problem rather than on locating basic information.

The checklist below is written for a commercial premises, an industrial facility or a logistics and warehousing building. Not every item applies to every site, and a blank answer is acceptable where something is genuinely unknown. What matters is that an estimate is labelled as an estimate. A figure presented as measured fact but later found to be approximate will affect every decision made from it, because each calculation inherits the error.

FIG 01Site facts and electricity records assembled at the Moorebank office before a review begins.

A working checklist

Ten items cover the inputs that most often decide whether a proposed measure is possible and worth pursuing. Work through what is available. There is no requirement to supply all of it at first contact, and a partly completed checklist is more useful than a delayed complete one.

01

Premises details

The suburb and state, the type of premises and a short description of what happens on site. Note the number of buildings, the approximate floor area and whether the site operates as one premises or several tenancies. A street address is usually not needed until a visit is being arranged, and naming the holder of an address is enough where the records sit with a head office.

02

The question

State what has prompted the enquiry in your own words. It might be rising demand charges, a roof due for renewal, a plan to add equipment, or a requirement to understand emissions before committing capital. Describing the problem rather than nominating a product lets the review test whether the proposed measure is the right one, and leaves room for a different answer.

03

Electricity bills

Recent bills, ideally covering a full twelve months, show consumption, demand charges and the tariff structure. They reveal the shape of the account even where interval data cannot be obtained. If bills are held by a head office or a managing agent, noting who holds them is sufficient to start; the documents can be requested from that holder later.

04

Interval data

Half-hourly or similar consumption data is the most useful single input, because it shows when the site draws power rather than only how much it draws in total. It can often be obtained from the meter provider or the retailer. Where it is unavailable, say so plainly; the review will identify what can still be concluded from bills alone and where the conclusion must remain provisional.

05

Operating hours

Record normal operating days and hours, shift patterns, seasonal peaks and any planned change to how the site is used. A building occupied only during business hours presents a very different case from one running continuously, and an announced expansion can change the design basis entirely. A shutdown window is a design input as much as an administrative detail.

06

Roof or yard

Approximate usable area, roof type, age, condition and shading are useful, along with any known constraint on loading. For a ground-mounted or yard-based option, note the available area and how it is currently used. Photographs help where a description is difficult, but a plan or a marked-up sketch with rough dimensions is enough at the outset.

07

Existing plant

List any generation, storage, metering, switchgear or major electrical equipment already installed, with approximate age and capacity if known. Existing systems affect what can be added and how it will interact with the site's connection. A single line diagram, if one exists, is particularly helpful; if it does not, a list of what is visible at the switchboard is a reasonable substitute.

08

Tenancy and consent

State whether the premises are owned or leased, and whether the roof or yard is common property. Where a site is leased, note the remaining term and whether a landlord or body corporate would need to approve work. These facts determine who can make a decision, not simply who would benefit from the outcome, and they belong in the scope as conditions to be checked.

09

Timing and budget gates

Explain any date that matters — a lease renewal, a planned shutdown, a budget cycle or a reporting deadline — and whether funding is already allocated or still to be approved. A timing constraint is a design input, because it decides which options can realistically be delivered within the window. An open-ended question is answered differently from one tied to a fixed date.

10

Constraints already known

Record anything already ruled out or already fixed: a connection that cannot export, a roof that cannot carry load, a heritage or planning restriction, a policy that requires a particular approach. Known constraints save a review from testing paths that cannot be taken. They are entered in the scope as assumptions to be verified, not as conclusions to be accepted without evidence.

Useful, unnecessary and inappropriate

Not all information helps at the outset. The table separates what is worth sending from what can wait and from what should not be sent at all. The distinction is practical rather than procedural: material sent too early is usually redone, and material that should never be sent creates a handling problem for everyone concerned.

CategoryExamplesHow the office treats it
UsefulTwelve months of bills, interval data, a site or roof plan, operating hours, existing equipment details, tenancy information, known constraints.Read during the initial review and recorded in the file. Where an item is an estimate, it is labelled as one and checked before any design relies on it.
Not neededA formally prepared tender, a finished design, engineering certification, a full structural report, board papers, detailed specifications.Can wait until a scope exists. Producing these before the site is understood usually means redoing them once the constraints are known.
Do not sendBank account details, tax file numbers, passwords, personal identification documents, payment cards, confidential material unrelated to the site.Not required at any stage of an enquiry and not retained. Remove such details from documents before sending them, including from scanned pages.

Preparation terms

Three questions come up repeatedly at this stage. They are answered here as definitions, because the answers explain what the first exchange is for rather than adding further paperwork.

Interval data unavailable

Contact the office anyway. Bills still establish consumption, demand charges and tariff structure, and the review can state what remains uncertain. Where a conclusion depends on the shape of the load, that uncertainty is recorded rather than filled with an assumption presented as a measurement.

Choosing a solution early

Not necessary. The Request a Quote form asks for an enquiry type so that the first questions are relevant, not to fix the answer. If the review shows a different area would serve the site better, that is stated. An early preference is useful information; an early commitment is not.

Documents sent later

Yes, and this is the usual pattern. The office identifies what would change the answer, the client provides what is available, and the review proceeds on that basis. The file stays at Moorebank, so material added later is considered alongside the original question rather than in place of it.

Measurement

A figure taken from a bill, a meter record or a physical dimension that has been checked. It is recorded as fact only in those circumstances.

Estimate

A figure supplied from memory, observation or a rough sketch. It remains useful throughout a review, provided it is marked as an estimate at the time it is supplied.

Unknown

The honest answer where no figure exists. An unknown creates a bounded gap in the review, which is preferable to a false figure that travels unnoticed into every later calculation.

FIELD NOTE — the value of a plain description

An honest description beats a polished submission

If a figure is an estimate, label it. If a document does not exist, say so. Clear gaps can be worked around because the review knows where to be cautious. Hidden gaps tend to reappear after a scope has been agreed, at which point they are more expensive to resolve. A short paragraph in ordinary language is worth more than a folder of material that implies a precision it does not have.

Documents in priority order

Where only a few items can be gathered, gather them in the order below. The first tier is sufficient to open a useful review; later tiers remove uncertainty and shorten the exchange. Nothing here needs to be formally prepared or certified before contact is made.

PriorityDocumentWhy it is useful
FirstA recent electricity bill showing consumption and maximum demand, together with the tariff name.Establishes the account's scale, the shape of its charges and whether demand is a material part of the bill.
FirstA short description of the premises, its suburb and what happens on site.Sets the sector context and tells the office which questions to ask first.
SecondTwelve months of interval data, if the meter provider or retailer can supply it.Shows when the site draws power, including the early mornings and weekends that verbal accounts miss.
SecondA roof or site plan, even a marked-up sketch, with approximate dimensions.Allows a first check of area, orientation and shading before a visit is arranged.
ThirdAn existing single line diagram, switchboard schedule or equipment list.Helps identify spare capacity and interactions with plant already installed.
ThirdLease, tenancy or strata information and any known building programme.Identifies who must consent and whether a roof or shutdown date constrains the work.

Reading the numbers on a bill

Two figures on a commercial electricity bill carry most of the information. They answer different questions, and treating them as interchangeable is a common way to reach the wrong conclusion before a review has even begun. The tariff name matters as well, because time-of-use periods and demand charges behave differently under different agreements.

FigureWhat it describesWhat it changes in the review
ConsumptionUsually expressed in kilowatt hours, the total electricity used over the billing period.Indicates the size of the opportunity and the volume of energy available to be shifted or generated on site.
Maximum demandThe highest level of draw recorded in a defined interval during the period, expressed in kilowatts.Shows whether a charge is driven by a few short events rather than by steady use, and whether peak-focused measures have a case.
Tariff nameThe agreement under which consumption and demand are charged, including time-of-use periods.Determines when a kilowatt hour is valuable and how a demand charge is measured and applied.
Billing periodThe span of time the bill covers and whether it includes seasonal extremes.A short period can overstate a peak or miss a seasonal pattern that a full year would reveal.

A bill with a modest annual total can still present a strong case for load management: one repeated afternoon peak may set a demand charge that dominates the account. Conversely, a site with high consumption and a flat demand profile may have little to gain from peak-focused measures. If a figure is unclear, send the bill as it is and note the uncertainty rather than translating it into an estimate of your own.

FIELD NOTE — how to phrase a limit

Constraints belong in the brief, stated with their source

A constraint is any fact that rules something out or fixes a boundary: an export limit that cannot be exceeded, a roof that cannot accept additional load, a heritage or planning condition, a policy that requires a particular approach, or a date before which work must be complete. Describe it in the terms you know and say how you know it. Where it is already decided, record it as decided; where it is suspected, label it as suspected. Both are valuable, but they lead to different work. A decided constraint narrows the design immediately, while a suspected one becomes the first thing the review tests and may turn out not to apply.

What should not be sent

Some material is inappropriate for an enquiry regardless of how relevant it may seem. Detailed specifications, engineering certification and tender documents can wait until a scope exists; producing them before the site is understood usually means redoing them later.

Account credentials

Retailer account passwords and portal logins are not required. A bill can be read without access to the account, and no stage of an assessment depends on credentials being disclosed.

Financial identifiers

Bank account numbers, payment card details and tax file numbers are not needed to discuss a scope and should be removed from any document before it is sent.

Personal identification

Copies of identification documents are not required for a site review. Where a scanned bill contains such material, redact it rather than relying on the office to ignore it.

Unrelated confidential material

Commercial material that has no bearing on the premises should not accompany an enquiry. Keeping the file to the site makes it easier to trace assumptions later.

After the enquiry is sent

The sequence below describes the normal path. It is not a schedule with fixed intervals: the time each step takes depends on the question and on the material available. What is consistent is the order, and the fact that the file stays at the Moorebank office throughout.

01

The enquiry is read

The message is received at Moorebank and the site, the sector and the question are noted. If the information is sufficient, the review starts; if not, the first response asks for the specific missing facts rather than a general request for more information.

02

The position is stated

An account of what is known, what is assumed and what would change the answer reaches the client. This may include a recommendation to obtain a particular document before any further work is done.

03

The site is understood

Bills, interval data and physical constraints are reviewed together. Where a visit is needed, it is arranged at this stage with the site's operating pattern in mind rather than on a convenient calendar date.

04

A scope is written

The chosen measures are recorded in one document with assumptions, exclusions and decision points. If the finding is that the project should not proceed, that is reported directly and the written review is still provided.

05

Commercial terms follow, if they follow at all

Any figure appears only after the scope is settled, with the basis stated alongside it. No price is a quotation until it is tied to an accepted scope.

Once the basics are assembled, the Request a Quote form is the fastest way to put them in front of the office. If a conversation is preferred first, the contact page lists the telephone number and email address. The Frequently Asked Questions page answers the questions that most often follow an initial enquiry.

Preparation questions

Documents and gaps.

Three questions about what to send and what to leave out.

Do I need interval data to start?

No. A recent bill establishes the tariff and the scale, and the office can say whether interval data would change the answer. Where the question concerns a peak or a storage duty, interval data becomes necessary before sizing.

Can documents be redacted?

Yes, and they should be. Retailer logins, bank details and personal identification are removed before sending. A redacted bill still shows the tariff, the consumption and the charges that matter.

What if the site is managed by an agent?

Name the agent and the account holder in the first message. Access, consent and metering usually run through them, and establishing that early prevents a design that nobody is authorised to install.

Send the prepared enquiry

Put the site facts in front of the office.

Bills, a roof plan and a note on operating hours are the useful starting set. Anything missing can follow.

The suburb, premises type and account holder.

The question the site needs answered.

Which documents are held and which are missing.

The form prepares a message in your own email program, addressed to the Moorebank office. Nothing is sent until you send it. Details are used only to answer the enquiry, as described in the Privacy Policy.