This account is an illustrative example of the company's method. Client names and commercial figures are not published; findings are qualitative and drawn from the measured record.
The site and the demand pattern
The refrigerated store ran through the night. Compressors and evaporators worked hardest after dusk, but the recorded demand peak did not match the steady running load. It came from short events: a compressor returning after defrost, a burst of door activity during receiving, and plant sequences that stacked several loads into one interval. Between events the site drew a relatively constant load.
The billing record used a defined demand interval, and the highest event inside the demand period set the charge. A battery that discharged evenly across the night could move a meaningful quantity of energy without lowering that highest interval. The design therefore started from the meter trace: identify the intervals that set the charge, establish what the plant was doing in each, and place discharge at those intervals. Capacity followed from the shape of the peaks, not from a daily energy total.
The operator had been quoted a single-duty battery that would shave the meter peak and do nothing else. The same equipment would sit idle for much of the day while other electrical needs remained: circulation, lighting, materials handling and building services. The engineers were asked to test whether one battery could serve more than one need without losing the primary function.
Duties separated before capacity was assigned
Interval data was read alongside the plant log. The overnight baseline was even; the demand events were irregular. Defrost cycles did not begin at the same time each night, and receiving depended on deliveries. The highest events clustered in the period that determined the demand charge, so timing of discharge mattered more than total energy stored.
The duties and limits were written down before any capacity was assigned:
- Primary duty — reduce short meter peaks during the overnight demand period.
- Secondary duty — support named critical circuits during a supply disturbance.
- Recharge rule — restore state of charge outside the demand window, without creating a fresh peak.
- Dispatch envelope — conservative throughput, with inverter current limits set against compressor restart current.
- Location — outside the refrigerated envelope, close to the switchboard.
Peak shaving held precedence at all times. The secondary duty could draw only on capacity the first duty did not need, and backup was limited to named circuits rather than becoming a continuous load. Writing each duty with its own priority and limit exposed the conflicts before commissioning: a recharge landing inside the protected window, or the support function consuming capacity reserved for shaving.
Siting constraints
The cabinet could not sit inside the refrigerated envelope. Low ambient temperatures and condensation would interfere with its thermal management, and access would interrupt store operations. It also had to be close to the switchboard to keep cable runs short and fault loops predictable. Several positions around the plant room were ruled out because they blocked trolley routes or sat in the path of defrost drainage. Ventilation clearance was checked against the cabinet's heat rejection. The chosen position left space for a service visit without moving stock.
Control settings
Control was threshold-based rather than scheduled. A fixed timetable would have discharged too early on some nights and too late on others, because defrost did not keep to a fixed time. The engineers observed several weeks of plant behaviour, then set thresholds against the electrical signature of an event. The settings were adjusted once, after the irregular pattern was understood.
The system was also given explicit exclusions: it would not follow the refrigeration temperature setpoint, and it would not charge from the grid during the demand window. Inverter current limits were set after compressor restart currents were established, so the battery would not be pushed offline by the inrush of the event it was meant to catch. The available fault level at the point of connection was checked and protection settings recorded.
The load analysis worked with the distribution of events rather than an average curve, which would have smoothed away the feature that mattered. Each event was classified by whether it fell inside the billing demand period and how long it lasted. The steady base load was kept explicitly separate from the events.
Commissioning and verification
Commissioning tested the control rules as well as the equipment. The battery was witnessed responding to a simulated peak event, the support circuits were checked for correct transfer, and a recharge was deferred when it would have coincided with a high-demand interval. Each test was repeated under a different plant state so the response could not depend on one favourable set of conditions.
The refrigeration controls were returned exactly as found. Temperature control and defrost sequence stayed as the operator had set them, so any change in the demand record could be attributed to the storage system rather than to a reprogrammed controller.
After handover, the interval record was read against the same baseline method used before installation. The highest events at the meter were lower, and the reduction was concentrated in the periods identified in the original analysis rather than spread evenly across the night. The steady base load was essentially unchanged, confirming the battery was answering events rather than shifting energy. The support duty was exercised without affecting the shaving function.
At handover the operator received the threshold settings, the observation record, the protection settings at the point of connection and the list of named support circuits.
Post-installation demand compared like-for-like with the pre-installation baseline from the same metering source.
Peak shaving retained precedence; the support duty operated without displacing reserved capacity.
Refrigeration controls left as found; store operations continued through installation and commissioning.
Questions about this project
Why was the battery originally specified for one duty only, and what changed?
The original quotation described a single-function asset: shave the meter peak, then wait. That left the equipment idle for most of the day while the store's other electrical loads continued. The engineers added a secondary duty — support for named critical circuits during a supply disturbance — under an explicit hierarchy. Peak shaving kept precedence at all times, the secondary duty could draw only on unreserved capacity, and the dispatch envelope stayed conservative so the added function did not degrade the primary one.
How was the demand period identified?
From the billing record and the meter trace together. The tariff applied a demand charge based on the highest interval within a defined period. The engineers matched each recorded peak interval to the plant log to establish its cause — post-defrost compressor restart, receiving activity, or stacked plant sequences — and confirmed that the highest events clustered inside the chargeable period. Discharge thresholds were then set against the electrical signature of those events, not against a clock.
What siting constraints governed the cabinet location?
Four constraints applied. The cabinet had to sit outside the refrigerated envelope because cold and condensation interfere with its thermal management. It had to be close to the switchboard to keep cable runs short and fault loops predictable. Candidate positions could not block trolley routes or defrost drainage paths. Ventilation clearance had to satisfy the cabinet's heat rejection, and the final position left room for maintenance access without moving stock.
How was the outcome verified?
By comparing like-for-like intervals from the same metering source, using the baseline method fixed before installation. Ambient conditions and changes in receiving activity were recorded. The check looked for lower peak intervals concentrated in the identified demand periods, with the steady base load unchanged. Refrigeration controls were left as found so the result could be attributed to the battery and its rules alone.
Why did the battery not simply follow the largest load?
The largest load was steady refrigeration, which the battery could not economically serve. The charge was set by short restart events, so the asset was specified for power over a short duration, not for energy across the night.
How was the peak attributed to compressor restarts?
Through interval data read against the plant's event log. The intervals that set the monthly charge coincided with defrost recovery and door activity, not with steady running load, which separated the controllable event from the structural load.
What limits a battery used for both peak shaving and backup?
Energy reserved for backup cannot be cycled daily without being unavailable when needed. The duties were ranked, peak shaving took priority, and the backup function was defined as a separate, narrower commitment rather than assumed.
Related work
Warehouse storage and rooftop staging.
Two accounts where the constraint set the asset.
Client comment
On ranking the duties.
A comment on the hierarchy of duties.
“Ranking the duties changed the size and the cost. The battery we needed was smaller than the one we had asked for.